Lower combustion furnace.
Fuel - straw (cubes, bales).
Catalogue sheet for print
Air transport elements visible on the photos are not standard equipment of the furnace.
Characteristics
- Lower combustion furnace.
- Furnace chamber and burner are lined with a ceramic lining.
- Fuel - straw (cubes, bales).
Version of a Robust furnace of type Us
Furnaces type Us are manufactured in sizes depending on customer needs.
Advantages
- Compact, module, modern construction,
- No corroding factor in the exchanger and installation,
- Long life cycle of the device,
- Chimney draught forced by the turbine allows for the application of a low chimney,
- High cost-efficiency in comparison with other solutions,
- Simple operation and high efficiency,
- The furnace does not require a specialist room (boiler room); in the case of application of heating of the external casing, the furnace may be mounted under an umbrella roof.
- Our furnaces have a wide range of applications in facilities having good access to straw.
Operation
The furnace operation is fully automatic. It is limited only to the process of fuel loading. This operation is carried out manually but the device is constructed so that it could make use of the production waste material as the fuel.
Technical Data
Robust furnace | Type | Us-800 |
Device power | KW | 800 |
Maximum temperature of air supply | °C | 100 |
Chimney conduit | mm | 250-300 |
Chimney diameter | mm | 250-300 |
Amount of heated air | szer. mm wys. mm gł. mm |
1500 3500 1800 |
Amount of heated air | m3/h | 23000 |
Dimensions of hot air outlet | mm | 1900 × 1900 |
Size | width mm height mm depth mm |
2700 4500 9700 |
Mass | kg | 12000 |
The temperature of air supply depends on calorific value of fuel and applied heat exchanger. The table contains maximum temperature of air supply.
Warranty
- We hereby grant a 5-year guarantee on subassemblies manufactured by our company.
- The contractor undertakes to fulfil its obligations under the guarantee within:
– 7 working days form the date it is confirmed (via electronic mail or fax) that the relevant spare part necessary to remove the defect is available on the territory of the Republic of Poland,
– 14 working days form the date it is confirmed (via electronic mail or fax) that the relevant spare part necessary to remove the defect is available on the territory of the European Union,
– 28 working days form the date it is confirmed (via electronic mail or fax) that the relevant spare part necessary to remove the defect is available outside the territory of the European Union.
Price list
In order to obtain information about the prices, please contact us at the following phone number:
+48 604 47 62 14
Upon a client's demand, we prepare a project design and a specification of the air distributing installation (ITP) against payment.
We provide assistance in the purchase of fittings (ITP) as well as in the installation assembly.